Supplying a part of the 42-inch pipe of Gore-Jask crude oil transfer project

The contract is to supply a part of the 42-inch pipe of the Gore-Jask crude oil transmission pipeline project (50% of the required pipe) with an approximate length of 529 km and an approximate weight of 184,000 tons with the participation of Ahvaz Pipeline Company.
The approximate place of delivery of the goods in the construction of the 42-inch Gore Jask pipeline (18% pipe at station number 2 km 148, 15% pipe at station number 3 km 304, 13% pipe at station number 4 km 438, 19% pipe at station no. 5 km 758, 14% of pipes in Topek Rani station, km 854 and 21% of pipes in Jask terminal, km 1000)

The pipes must be coated with FBE after manufacturing in the company approved by the employer.
Sheets must be supplied and delivered to the pipe manufacturer within 6 months. The first shipment of manufactured and coated pipes in the seventh month and the last shipment in the twenty-fourth month should be equally delivered to the specified locations based on different thicknesses according to the approved schedule.
The supply of another part of the 42-inch pipe of the Gore-Jask crude oil transmission project with an approximate length of 136 km and an approximate weight of 55 thousand tons was entrusted to Aljuman trading L.L.C Company with the participation of Safa Rolling and Pipe Company.

 