The EPC contract includes detailed design, purchase of goods and implementation of the construction of hot gas LPG transmission lines from the refineries in phases 13 and 22-24 to the refinery in phase 19 of South Pars Common Field. The 6- and 8-inch propane and warm butane pipelines of phase 22-24, after about 2 kilometers, are continued with two 6- and 8-inch phase 13 lines in a channel to the intermediate station and after making the necessary connections and connections to the pumps in the mentioned station has two 8-inch butane and 10-inch propane pipelines leaving the said station and continuing to the Phase 19 pumping station for about 6,800 km in a common channel.
A - Completing the detailed design
Detailed design services include mapping and route map preparation, soil science operations, detailed design, HAZID, HAZOP studies, environmental studies, passive defense studies, and value engineering studies.
B - supply and procurement of goods and materials (P)
It includes the provision of all the special goods needed for the project, whether it is built inside or outside, based on the plans and technical documents approved by the employer and the standards in the list of contract goods, as well as the supply of non-special goods that are not included in the list of special materials, and for installation, performing operations Implementation, launch and delivery of the project are essential.
THE BEST